Results search

Kempton Park

  • 18:50 Afm Services Data Centre Construction Handicap5f

  • £4,000 added 3yo+ 12 ran
  • Winner: £
  • Going: Standard
  • Surface: Polytrack
    Weighed In
  • Winning time: 0m 59.48s
  • Off time: 18:51:43

Full result

18:50 Kempton Park Result 10th December 2008
Pos Draw Dist Horse Weight Jockey Trainer Age SP
1st (9) Bookiesindex Boy 8-12 D Holland J R Jenkins 4 9/1
Made all, 3 lengths clear over 1f out, weakening towards finish, held on opened 10/1 touched 10/1
2nd (11) ½ Thoughtsofstardom 8-4 L Morris (3) P S McEntee 5 6/1
Prominent, chased winner 3f out, 3 lengths down and driven over 1f out, closed as winner weakened towards finish, just held opened 11/2 touched 7/1
3rd (12) ¾ Musical Script (USA) (ex6) 8-12 Dane O'Neill Mouse Hamilton-fairley 5 2/1f
Held up, good headway on inside 2f out, chased leading pair over 1f out, ran on inside final furlong, looked held when nowhere to go near finish opened 11/4 touched 11/4 £1100-£400 £1000-£400(x5) £500-£200(x3)
4th (3) Hereford Boy 9-4 J D O'Reilly (5) D K Ivory 4 18/1
Soon ridden in mid-division, driven halfway, ran on inside final furlong opened 20/1 touched 20/1
5th (1) hd Bertie Southstreet 8-8 M Dwyer J R Boyle 5 20/1
Chased leaders, ridden halfway, weakened inside final furlong opened 20/1 touched 20/1
6th (6) ½ Step It Up (IRE) 8-10 S J Drowne J R Boyle 4 9/1
Held up in rear, ran on inside final furlong, nearest finish opened 7/1 touched 9/1
7th (7) nse Wreningham 8-5 J Quinn T Keddy 3 14/1
Took keen hold, chased leaders, ridden and no impression when hung right over 1f out, weakened final furlong opened 12/1 touched 14/1
8th (10) nk Woodcote (IRE) 9-3 G Baker P R Chamings 6 7/2
Reared start, behind, kept on inside final furlong, never threatened leaders opened 4/1 touched 4/1
9th (4) ½ Monsieur Reynard 8-8 M Geran (5) J M Bradley 3 28/1
In rear, moderate headway final furlong opened 33/1 touched 33/1
10th (8) nse Caribbean Coral 9-4 P Nolan (7) A B Haynes 9 50/1
Held up, always in rear opened 50/1 touched 66/1
11th (5) Matterofact (IRE) 8-5 P Doe M S Saunders 5 25/1
Always towards rear, no chance final 2f opened 25/1 touched 25/1
12th (2) Desert Opal 8-10 Liam Jones C R Dore 8 16/1
Chased winner for 2f, soon under pressure and behind opened 14/1 touched 16/1

Betting breakdown

Tote Win: £0.00 Tote Place: ££2.40,£2.50,£1.20
Straight Forecast: £0.00 Exacta: £0.00 Swingers: 1&2:£26.60 2&3:£2.20 1&3:£5.40

Placepot: £1,681.00, Pool: £119054.62, 51.7 winning tickets
Quadpot: £266.60, Pool: £7856.1, 21.8 winning tickets
Jackpot: £4,698.27 carried forward to Huntingdon, 11th Dec