Results search

Kempton Park

  • 18:50 Afm Services Data Centre Construction Handicap1m 2f

  • £3,000 added 3yo+ 13 ran
  • Winner: £
  • Going: Standard
  • Surface: AllWeather
    Weighed In
  • Winning time: 2m 57.57s
  • Off time: 18:52:24

Full result

18:50 Kempton Park Result 12th December 2007
Pos Draw Dist Horse Weight Jockey Trainer Age SP
1st (8) Mr Napoleon (IRE) 9-2 G Baker G L Moore 5 11/2
Steadied start, settled in rear, headway on inside well over 1f out, not clear run soon after, switched left inside final furlong, ran on to lead well inside final furlong opened 15/2 touched 15/2
2nd (4) ½ Wind Flow 8-11 J F Egan C A Dwyer 3 7/2f
Mid-division, good headway on outer over 1f out, chased winner and 3rd inside final furlong, took 2nd post opened 5/1 touched 5/1
3rd (2) s.h Charlottebutterfly 9-1 R Havlin P J McBride 7 14/1
Towards rear, good headway on outer over 1f out, ran on to chase winner inside final furlong, every chance, lost 2nd post opened 10/1 touched 14/1
4th (14) 1.5 Always Sparkle (CAN) 8-13 C Catlin B Palling 3 25/1
Led, ridden 2f out, ran on well until headed well inside final furlong opened 50/1 touched 50/1
5th (10) 1 Shunkawakhan (IRE) 8-10 T Dean (5) G C H Chung 4 12/1
Took keen hold, tracked leaders, chased leader 2f out, ridden and every chance entering final furlong, no extra final 100 yards opened 11/1 touched 12/1
6th (11) ½ Mythical Charm 9-1 Saleem Golam (7) J J Bridger 8 16/1
Took keen hold in touch, effort over 1f out, not quicken final furlong opened 14/1 touched 16/1
7th (7) nk Bowl of Cherries 9-1 Dane O'Neill I A Wood 4 8/1
Behind, ridden 2f out, some headway over 1f out, not reach leaders opened 11/1 touched 11/1
8th (12) 1 Danelor (IRE) 8-11 V Poirier D Shaw 9 25/1
Mid-division, chased leaders over 1f out, no extra when slightly hampered inside final furlong opened 25/1 touched 25/1
9th (3) nk Theatre Royal 8-11 N Chalmers (3) Mouse Hamilton-fairley 4 20/1
Held up behind, no headway final 2f opened 20/1 touched 20/1
10th (13) 5 Glenridding 8-13 T P Queally J G Given 3 9/1
Tracked leader to 2f out, weakened over 1f out opened 10/1 touched 10/1
11th (5) hd Shaheer (IRE) 8-11 Greg Fairley J Gallagher 5 4/1
Prominent, ridden over 3f out, outpaced final 2f opened 4/1 touched 9/2
12th (1) 5 High Class Problem (IRE) 9-1 Jim Crowley P Winkworth 4 12/1
In touch to over 4f out, weakened and soon behind opened 12/1 touched 14/1
13th (9) 3 Jarvo 9-0 A Elliott (3) I W McInnes 6 14/1
Mid-division, ridden over 3f out, lost place quickly and soon in rear opened 9/1 touched 14/1
NR (6) Raydan (IRE) 9-2 M Fenton D R Gandolfo 5

Betting breakdown

Tote Win: £0.00 Tote Place: ££2.90,£2.00,£2.30
Straight Forecast: £0.00 Exacta: £0.00

Jackpot: £16,811.50 carried forward to Huntingdon, 13th Dec
Placepot: £577.60, Pool: £98085.6, 123.95 winning tickets
Quadpot: £22.00, Pool: £8318.5, 279.6 winning tickets
PlaceSix: £274.41
PlaceFive: £36.73