Racecards
18:50 Kempton Park
Afm Services Data Centre Construction Handicap (Class 6)
- 13 Runners
- Distance: 1m 2f
- Going: Standard
- Surface: AllWeather
- £3,000 added
- Form 303070
- Age 5
- Weight 9-2
- Official Rating 55
- Trainer G & J Moore
- Jockey G Baker
steadied start, settled in rear, headway on inside well over 1f out, not clear run soon after, switched left inside final furlong, ran on to lead well inside final furlong
- Form 056065
- Age 4
- Weight 9-1
- Official Rating 54
- Trainer P Winkworth
- Jockey Jim Crowley
in touch to over 4f out, weakened and soon behind
- Form 484739
- Age 8
- Weight 9-1
- Official Rating 54
- Trainer J J Bridger
- Jockey Saleem Golam
took keen hold in touch, effort over 1f out, not quicken final furlong
- Form 122601
- Age 7
- Weight 9-1
- Official Rating 54
- Trainer P J McBride
- Jockey R Havlin
towards rear, good headway on outer over 1f out, ran on to chase winner inside final furlong, every chance, lost 2nd post
- Form 871496
- Age 4
- Weight 9-1
- Official Rating 53
- Trainer I A Wood
- Jockey Dane O'Neill
behind, ridden 2f out, some headway over 1f out, not reach leaders
- Form 112396
- Age 6
- Weight 9-0
- Official Rating 53
- Trainer I W McInnes
- Jockey A Elliott
mid-division, ridden over 3f out, lost place quickly and soon in rear
- Form 07-967
- Age 3
- Weight 8-13
- Official Rating 55
led, ridden 2f out, ran on well until headed well inside final furlong
Glenridding
12- Form 964502
- Age 3
- Weight 8-13
- Official Rating 55
- Trainer J G Given
- Jockey T P Queally
tracked leader to 2f out, weakened over 1f out
- Form 228602
- Age 5
- Weight 8-11
- Official Rating 50
- Trainer J Gallagher
- Jockey Greg Fairley
prominent, ridden over 3f out, outpaced final 2f
- Form 322000
- Age 9
- Weight 8-11
- Official Rating 50
mid-division, chased leaders over 1f out, no extra when slightly hampered inside final furlong
- Form 097100
- Age 4
- Weight 8-11
- Official Rating 50
- Trainer Mouse Hamilton-fairley
- Jockey N Chalmers
held up behind, no headway final 2f
- Form 443337
- Age 4
- Weight 8-10
- Official Rating 49
- Trainer G C H Chung
- Jockey T Dean
took keen hold, tracked leaders, chased leader 2f out, ridden and every chance entering final furlong, no extra final 100 yards
In depth
Verdict
Glenridding has more scope for improvement than the majority of his main rivals and gets the nod over Charlottebutterfly, Shunkawakhan and Bowl Of Cherries. The last named goes well here and is suited by the trip. However, his last three starts have been below par and he needs to pull something out of the hat tonight. Shunkawakhan is a long standing maiden and has something to prove regarding the trip. However, this is ordinary fare and, as he has a good record of making the frame, he is no forlorn hope. Charlottebutterfly, on the other hand, came good from a poor draw last time out and has to be shortlist material. The seven-year-old has nothing to fear about the trip and will be a tough customer to deal with. Nevertheless, the lightly raced Glenridding comes here on the back of her best ever performance and, as Tom Quealy knows her well, this looks to be the right time for her to strike.
Formwatch
Mr Napoleon (IRE) 7-1 (8-13) Always towards rear, 10th of 14, 3l behind Stark Contrast (9-2) at Lingfield 1m 2f hcp 0-60 (6) pol in Nov.
High Class Problem (IRE) 8-1 (9-1) Pressed leaders, ridden to lead well over 1f out, headed 1f out, kept on same pace, 5th of 14, 2 1/2l behind Millfield (9-1) at Lingfield 7f hcp 0-60 (6) pol in Nov.
Mythical Charm 6-1 (8-11) Slowly into stride, soon mid-division, chased leaders over 2f out, no headway and weakened approaching final furlong, 9th of 13, 9l behind Carlitos Spirit (9-3) at Kempton 1m app hcp (6) pol.
Charlottebutterfly 8-1 (10-11) Mid-division, headway over 2f out, kept on inside final furlong to lead post, won at W'hampton 1m 1f amt hcp (6) pol in Nov beating Machinate (10-13) by a hd, 13 ran.
Bowl of Cherries 6-1 (9-1) Held up in touch, effort over 2f out, weakened over 1f out, 6th of 11, 9l behind Mutamaasek (9-3) at Lingfield 1m 2f hcp 0-60 (6) pol.
Jarvo 7-1 (8-11) Held up, headway over 1f out, never nearer, 6th of 12, 7l behind Sawwaah (9-7) at Brighton 1m 2f hcap (6) gf in Jun.
Always Sparkle (CAN) 9-1 (8-11) Took keen hold in touch, ridden and no impression 2f out, weakened 1f out, 7th of 10, 8l behind Fresh Mint (8-13) at Kempton 1m 4f 3yo hcp (6) pol in Nov.
Glenridding 25-1 (8-7) Led, headed over 6f out, chased winner over 2f out, ran on inside final furlong, 2nd of 13, nk behind Arthur's Edge (8-5) at W'hampton 1m 1f hcp (6) pol in Nov.
Shaheer (IRE) 7-1 (9-0) Always prominent, ridden to lead inside final furlong, headed post, 2nd of 13, shd behind Play Up Pompey (8-13) at Lingfield 1m 2f hcp 0-50 (6) std.
Danelor (IRE) 16-1 (8-11) Slowly away, saddle slipped soon after start, chased leaders until eased over 3f out, last of 11, 18l behind Mutamaasek (9-3) at Lingfield 1m 2f hcp 0-60 (6) pol.
Theatre Royal 40-1 (8-7) Held up mid-division, ridden over 2f out, weakened over 1f out, 12th of 14, 4l behind Stark Contrast (9-2) at Lingfield 1m 2f hcp 0-60 (6) pol in Nov.
Wind Flow 14-1 (8-11) Tracked leaders, driven to challenge over 2f out, every chance over 1f out, kept on, 3rd of 12, 3/4l behind Just Intersky (9-3) at Lingfield 1m 2f hcp 0-60 (6) pol.
Shunkawakhan (IRE) 3-1fav (8-13) Tracked leaders, ridden and effort over 2f out, weakened over 1f out, 7th of 12, 3 1/2l behind Confidentiality (8-7) at Lingfield 1m app hcp (6) pol in Nov.
Raydan (IRE) 20-1 (9-7) Mid-division, ridden and outpaced 2f out, weakened over 1f out, 11th of 13, 20l behind Highest Esteem (9-6) at Kempton 1m 4f hcp 0-60 (6) pol in Nov.